Your cart is empty, and it looks like you haven’t added anything yet.
The short rains (mvua za vuli) usually reach Dar es Salaam in November. A half-built house with an open roof, cement bags on bare ground and no drainage can lose weeks of work and money in one heavy downpour. Walk your site this week, before the first storm, and use this checklist.
Kwa Kiswahili: Mvua za vuli zinakaribia. Kagua paa, hifadhi ya saruji na nondo, na mifereji ya maji kwenye site yako wiki hii kabla mvua hazijaanza.
| Check | Done? |
|---|---|
| Roof sheets, nails and ridge checked | ☐ |
| Gutters and downpipes clear | ☐ |
| Cement raised and covered | ☐ |
| Steel raised and covered | ☐ |
| Drainage channels clear | ☐ |
| Cables and tools kept dry | ☐ |
| Materials for the next phase ordered | ☐ |
Deliveries are easier before heavy rain makes site roads soft. On Ujenzi Direct you can order cement, plumbing fittings and shovels and digging tools online, see the delivery fee before you pay, and have them delivered to your site within the Dar es Salaam Region, Monday to Saturday. If a large truck cannot reach your plot after rain, we will agree the nearest safe drop point with you. See our Shipping Policy.
You need to Sign in to view this feature
This address will be removed from this list